|
Author:Mikhail LebedevPublications |
---|
EasyChair Preprint 2914 | EasyChair Preprint 2809 |
Keyphrasesautomated process control system, BIM technology, Equilibrium state of rock mass, Field study of the stress-strain state, Geomechanical and geophysical investigations, geotechnical monitoring2, geotechnical monitoring system, Geotechnical risks, Lining parameters, long-term operation, old tunnel lining, railway tunnel, reconstruction, repair, risk management, risk rating, rock pressure, severo muisky tunnel, stress-strain state2, transport tunnel, tunnel construction, underground structure, underground structure enclosing massif system. |
|
|