Download PDFOpen PDF in browser

Reduce Time Overrun of High-Rise Building Projects in Vadodara City Using RII Method

EasyChair Preprint 11874

4 pagesDate: January 29, 2024

Abstract

A common problem in construction projects is time overruns. It depends on the project's size and type. This paper focuses on the classification and identification of time overrun factors in High-building projects in Vadodara city. A total of 66 factors of delay were identified under 9 different categories. Then a questionnaire survey is done to find the major causes of delay faced by owner, Contractor, Designer, Consultant, material, labour, equipment, project, and external. From the analysis of the questionnaire major causes of delay were identified with the help of Relative Important Index (RII) method.

Keyphrases: Factors of time overrun, RII method, Time overrun, quantitative method, time management

BibTeX entry
BibTeX does not have the right entry for preprints. This is a hack for producing the correct reference:
@booklet{EasyChair:11874,
  author    = {Nishit Kubavat and Darshit Shah},
  title     = {Reduce Time Overrun of High-Rise Building Projects in Vadodara City Using RII Method},
  howpublished = {EasyChair Preprint 11874},
  year      = {EasyChair, 2024}}
Download PDFOpen PDF in browser